Q.  HOW LONG DOES A FULL BATHROOM INSTALLATION TAKE? 

A.  The average installation time is between 7-10 working days.

Q. WILL I BE WITHOUT A TOILET AND WASHING FACILITIES?

A. You won’t be without a toilet, but unfortunately you will be without washing facilities during the installation. However, we could provide showering facilities along with gym use at the Village Hotel, Ashton- Under- Lyne and Bury.

Q. IS ALL WASTE REMOVED FROM SITE?

A. Yes. At the start of installation, all waste is removed and no rubble is left on site.

Q. WILL THERE BE MUCH DUST?

A. We keep dust levels down to a minimum, but unfortunately there will be a bit of dust to start with.

Q. WHAT TIME CAN I EXPECT BATHROOM FITTER TO ARRIVE AND LEAVE?

A. We have found the most popular time is between 8.30 – 9am, as this allows the customer to get ready for work. We endeavour to leave between 4.30 & 5pm. The fitter will be on site every day until installation is complete.

Q. CAN I TRUST TO LEAVE THE KEY WITH BATHROOM FITTER?

A. Definitely yes! You can be assured the fitter will treat your home with respect and consideration during the whole installation period. They will only gain access to parts of your home needed to complete the installation.

Q. CAN I MAKE ADJUSTMENTS TO THE ORIGINAL DESIGN DURING INSTALLATION?

A. Yes. Small changes to the design would be acceptable. We endeavour to

complete the installation to your satisfaction, and will try our best to

comply to your requirements.